Videos streaming images jeux et buzz
Connexion






Perdu le mot de passe ?

Inscrivez-vous maintenant !
Menu Principal
Communauté




Koreus
🔌 Site inaccessible de 8h à 10h30
 1  #1
Webhamster
Inscrit: 03/07/2002 23:58
Post(s): 75377
Karma: 36948
Site inaccessible ce matin de 8h à 10h30

L'hébergeur OVH a eu un problème avec son réseau optique (bug software)
Tout est revenu à la normale.

Pensez à suivre le comte Koreus.com sur Twitter
https://twitter.com/koreuscom

Edit : Plus d'infos


Contribution le : 09/11/2017 10:45
Signaler

Adr1enb
 0  #2
La loi c'est moi
Inscrit: 19/04/2008 16:29
Post(s): 8776
Karma: 2423
Souci électrique dans un datacenter puis grosse panne réseau sur tous les POP, pas de bol 😕

Contribution le : 09/11/2017 10:54
Signaler

Petis
 2  #3
Je masterise !
Inscrit: 15/12/2009 13:34
Post(s): 4780
Karma: 3586
On a pris les devants en attendant


Contribution le : 09/11/2017 10:57
Signaler

Infame_ZOD
 1  #4
J'aime glander ici
Inscrit: 10/12/2013 17:51
Post(s): 6019
Karma: 6622
Et moi qui ai tout débranché et rebranché chez moi comme un taré
Merci @Surzurois je connaissais pas mais j’ai vraiment la poisse on dirait
https://k.img.mu/C9bv80.png

^^

Contribution le : 09/11/2017 11:10
Signaler

Surzurois
 3  #5
J'aime glander ici
Inscrit: 16/09/2010 09:58
Post(s): 5345
Karma: 5152
@Infame_ZOD sinon y'a ça a tester avant de tout débrancher 🙂

Contribution le : 09/11/2017 11:11
Signaler

yoyoshi
 2  #6
Je suis accro
Inscrit: 24/10/2011 12:33
Post(s): 756
Karma: 201
@Surzurois

Je connaissais pas et j'ai testé ca : http://downforeveryoneorjustme.com/downforeveryoneorjustme.com

Contribution le : 09/11/2017 12:05
Signaler

-Flo-
 0  #7
Je poste trop
Inscrit: 08/01/2005 13:41
Post(s): 15190
Karma: 12562
C'est quand même assez fou ce qui leur est arrivé !

Sur leur datacenter de Strasbourg, que leurs 4 sources d'alimentation soient HS en même temps, c'est déjà dingue.

Mais qu'en plus de ça, simultanément, sur leur datacenter de Roubaix un incident software inexpliqué affecte le seul maillon non redondé de leur liaison optique (et il fallait le trouver), ça touche carrément au paranormal...

Je suis franchement dégouté pour eux ! 😕

Contribution le : 09/11/2017 19:15
Signaler

Adr1enb
 0  #8
La loi c'est moi
Inscrit: 19/04/2008 16:29
Post(s): 8776
Karma: 2423
@-Flo- Effectivement c'est surprenant et étonnant. 44 liens qui tombent d'un coup et ça: " Il s’agit clairement d’un bug software sur les équipements optiques. La base de données avec la configuration est enregistrée 3 fois et copiée sur 2 cartes de supervision. Malgré toutes ces sécurités, la base a disparu."

http://travaux.ovh.net/?do=details&id=28244

Contribution le : 09/11/2017 19:22
Signaler

 0  #9
Fantôme
https://www.nextinpact.com/news/105576-pannes-en-serie-chez-ovh-sites-inaccessibles.htm.

haha, je me demandais aussi pourquoi koreus était down ce matin XD.

Je sais pas à quel point octave avait de karma négatif mais je suis sûr qu'il a tout remboursé ce matin.

En tout cas mon kimsufi a échappé à tout ça 😉.

Contribution le : 09/11/2017 19:41
Signaler

Petis
 8  #10
Je masterise !
Inscrit: 15/12/2009 13:34
Post(s): 4780
Karma: 3586

Contribution le : 09/11/2017 20:30
Signaler

Alex333
 0  #11
Je poste trop
Inscrit: 07/07/2008 12:56
Post(s): 26241
Karma: 13552
Sympa qu'ils expliquent bien la situation comme ca

Contribution le : 09/11/2017 22:20
Signaler

-does-
 0  #12
Je masterise !
Inscrit: 19/04/2007 18:11
Post(s): 3869
Karma: 607
Citation :

C'est quand même assez fou ce qui leur est arrivé !


Gros down déjà en juin !

Quand tous tes clients t'appellent à 9h car plus de site et plus de boîtes mail ça pique.

Ils ont esquivé la dernière fois mais dans le contrat c'est remise en ligne en 1h...


Contribution le : 09/11/2017 22:23
Signaler

-Flo-
 0  #13
Je poste trop
Inscrit: 08/01/2005 13:41
Post(s): 15190
Karma: 12562
Le rapport d'incident détaillé pour SBG :

Citation :
Hello,
This morning at 7:23 am, we had a major outage in our Strasbourg site (SBG): a power outage that left three datacenters without power for 3.5 hours. SBG1, SBG2 and SBG4 were impacted. This is probably the worst-case scenario that could have happened to us.

The SBG site is powered by a 20KVA power line consisting of 2 cables each delivering 10MVA. The 2 cables work together, and are connected to the same source and on the same circuit breaker at ELD (Strasbourg Electricity Networks). This morning, one of the two cables was damaged and the circuit breaker cut power off to the datacenter.

The SBG site is designed to operate, without a time limit, on generators. For SBG1 and SBG4, we have set up a first back up system of 2 generators of 2MVA each, configured in N+1 and 20kv. For SBG2, we have set up 3 groups in N+1 configuration 1.4 MVA each. In the event of an external power failure, the high-voltage cells are automatically reconfigured by a motorized failover system. In less than 30 seconds, SBG1, SBG2 and SBG4 datacenters can have power restored with 20kv. To make this switch-over without cutting power to the servers, we have Uninterrupted Power Supplies (UPS) in place that can maintain power for up to 8 minutes.

This morning, the motorized failover system did not work as expected. The command to start of the backup generators was not given by the NSM. It is an NSM (Normal-emergency motorised), provided by the supplier of the 20KV high voltage cells. We are in contact with the manufacture/suplier to understand the origin of this issue. However, this is a defect that should have been detected during periodic fault simulation tests on the external source. SBG's latest test for backup recovery were at the end of May 2017. During this last test, we powered SBG only from the generators for 8 hours without any issues and every month we test the backup generators with no charge. And despite everything, this system was not enough to avoid today’s soutage.

Around 10am, we managed to switch the cells manually and started to power the datacenter again from the generators. We asked ELD to disconnect the faulty cable from the high voltage cells and switch the circuit breaker on again with only 1 of the 2 cables, and therefore were limited to 10MVA. This action was carried out by ELD and power was restored at approximately 10:30 am. SBG's routers were back online from 10:58 am onwards.


Since then, we have been working on restarting services. Powering the site with energy allows the servers to be restarted, but the services running on the servers still need to be restarted. That's why each service has been coming back gradually since 10:30 am. Our monitoring system allows us to know the list of servers that have successfully started up and those that still have a problem. We intervene on each of these servers to identify and solve the problem that prevents it from restarting.

At 7:50 am, we set up a crisis unit in RBX, where we centralized information and actions of all the different teams involved. A truck from RBX was loaded with spare parts for SBG. It arrived at its destination around 5:30 pm. To help our local teams, we sent teams from the LIM datacenter located in Germany and personnel from RBX datacenter, all of which have been mobilized on site since 4 PM. Currently, more than 50 technicians are working at SBG to get all services back online. We are preparing the work through night and if necessary into tomorrow morning.

In order to avoid catastrophic scenarios such as this one, over the past 18 years, OVH has developed electrical architectures that can withstand all sorts of power outages. Every test, every flaw, every new idea has enriched our experience allowing us to build reliable datacentres today.

So why this failure? Why didn’t SBG withstand a simple power failure? Why couldn’t all the intelligence that we developed at OVH, prevent this catastrophe?

The quick answer: SBG's power grid inherited all the design flaws that were the result of the small ambitions initially expected for that location.

Now here is the long answer:

Back in 2011, we planned the deployment of new datacenters in Europe. In order to test the appetite for each market, with new cities and new countries, we invented a new datacenter deployment technology. With the help of this internally developed technology, we were hoping to get the flexibility that comes with deploying a datacenter without the time constraints associated with building permits. Originally, we wanted the opportunity to validate our hypotheses before making substantial investments in a particular location.

This is how, at the beginning of 2012, we launched SBG1 datacenter made of shipping containers. We deployed 8 shipping containers and SBG1 was operational in less than 2 months. Thanks to this ultra-fast deployment which took less than 6 months we were able to confirm that SBG is indeed a strategic location for OVH. By the end of 2012, we decided to build SBG2 and in 2016, we launched the construction of SBG3. These 2 datacenters were not constructed from containers, but were based on our "Tower" technology. The construction of SBG2 took 9 months and SBG3 will be put in production within a month. In order to address the issue of space, at the beginning of 2013, we built SBG4 very quickly, based again on the much talked about shipping containers.

The issue was that, by deploying SBG1 with the technology based on shipping containers, we were unable to prepare the site for a large-scale project.

We made 2 mistakes:

1) We did not make the SBG site compliant with internal standards which require 2 separate 20KV electrical feeds just like all our DC locations, which are equipped with dual electrical feeds. It is a major investment of about 2 to 3 million euros per electrical feed but we believe this is part of our internal standard.

2) We built SBG2's power grid by placing it on SBG1's power grid instead of making them independent of each other, as in all our data centers. At OVH, each datacenter number indicates that the power grid is independent of other datacenters. Anywhere except on the SBG site.

The technology based on shipping containers was only used to build SBG1 and SBG4. As a matter of fact, we realized that the container datacenter doesn't fit the requirements of our trade. Based on SBG's growth rate, the minimum size of a site must be equal to several datacenters, and therefore have a total capacity of 200,000 servers. That's why in order to deploy a new datacenter today, we are only using 2 types of designs that have been widely tested and planned for large-scale projects and reliability:

1) the construction of 5 to 6-story towers (RBX4, SBG2-3, BHS1-2), for 40,000 servers.
2) purchasing buildings (RBX1-3,5-7, P19, GRA1-2, LIM1, ERI1, WAW1, BHS3-7, VIH1, HIL1) for 40,000 or 80,000 servers.

Even if this morning's incident was caused by third-party automaton, we cannot deny our own liability for the breakdown. We have some catching uptp do on SBG to reach the same level of standards as other OVH sites.

During the course of the afternoon, we decided on the following action plan:
1) the installation of a second, completely separate 20MVA electrical feed;
2) separating SBG2 power grid from SBG1/SBG4, as well as the separation of the future SBG3 from SBG2 and SBG1/SBG4;
3) migration of SBG1/SBG4 customers to SBG3;
4) closing SBG1/SBG4 and the uninstallation of the shipping containers.

This is a EUR 4-5 million investment plan, which we are launching tomorrow and hope will enable us to restore our customers' confidence in SBG and OVH.

Our teams are still hard at work to restore services to the last of the impacted customers. Once the incident is completely resolved we will apply the SLA under our contracts.

We are deeply sorry for this incident and we thank the trust that you place in us.

Best,
Octave



Moralité : éviter à tout prix le DC SBG pour le moment !

Contribution le : 10/11/2017 11:09
Signaler

Marsu_Xp
 1  #14
La loi c'est moi
Inscrit: 29/08/2004 02:21
Post(s): 11972
Karma: 954
Citation :

@Surzurois a écrit:
@Infame_ZOD sinon y'a ça a tester avant de tout débrancher :-)


Merci, dans mes favoris direct !

Contribution le : 11/11/2017 14:32
Signaler


 Haut   Précédent   Suivant






Si vous êtes l'auteur d'un élément de ce site, vous pouvez si vous le souhaitez, le modifier ou le supprimer
Merci de me contacter par mail. Déclaré à la CNIL N°1031721.